Pretium Synergy
Sign in
  1. Home
  2. ·Commercial
  3. ·Areas
  4. ·Kent logistics

Commercial · Areas

Commercial Solar, Storage & EV Charging for Kent Logistics

Assessed for your depot or warehouse — not a corridor-wide guess

Dartford and Medway sit on a major logistics belt into London and the Channel. Depots, warehouses and fleet yards — including Gravesend and Sittingbourne logistics fringe where we cover — face real constraints on grid capacity, landlord consents and downtime.

Pretium delivers commercial solar PV, battery storage, heat and cooling where relevant, and EV charging (including CPO) with fixed-scope discipline after proper assessment. This guide is commercial logistics only — not residential Kent or Bromley.

What's different about delivering here

  • High-bay roofs and yard space change the layout

    Warehouse and shed roofs plus yard space change solar and EV layout versus office parks. We scope against the building and yard, not a generic Kent estimate.

  • Fleet and depot charging often lead the programme

    Depot and yard charging frequently drive programme more than single workplace posts. We plan for fleet priorities and downtime windows, not catalogue one-offs.

  • Connection capacity risk is common on logistics estates

    Reinforcement and capacity risk show up often on logistics estates — we flag connection route and programme risk early as part of sober scoping.

  • We confirm the site position before fixed scope

    Grid, landlord consents and planning are site-specific — corridor notes are directional until we assess your premises.

Grid connection for Kent logistics

Licence areas for Dartford and Medway should be confirmed at assessment — much of this belt sits with UK Power Networks, but postcode bands vary. Commercial solar, storage and EV charging may need more involved connection processes than domestic G98; Pretium flags the likely route and programme risk early.

What we deliver here

  • Commercial Solar PV

    Warehouse and shed roofs and carports where assessed

    Explore Commercial Solar PV →
  • Energy storage

    Demand and resilience for depots where sized properly

    Explore Energy storage →
  • CPO / fleet charging

    Depot, yard and destination charging

    Explore CPO / fleet charging →
  • Commercial ASHP

    Commercial heat where amenity or office blocks on the estate need it

    Explore Commercial ASHP →
  • Air conditioning

    Offices and amenity blocks on estates where relevant

    Explore Air conditioning →
  • Energy transition packages

    Sequenced multi-site plan when several depots need one programme

    Explore Energy transition packages →

Tell us the site and what you're prioritising

Current · Business will help you see what's realistic for this site — then you can browse commercial offers when you're ready.

Browse commercial offers →

Grid connection, landlord consents and planning constraints are site-specific. The notes above describe corridor-wide patterns only. We confirm the position for your premises as part of assessment before recommending a fixed scope.

  • OZEV
  • ★Trustpilot|Rated Excellent
  • Stripe ClimateStripe Climate Contribution

© 2026 Pretium Synergy Ltd

CommercialAreaseMobilityInstallation termsResidentialPartnersContactPrivacy