Commercial Battery Storage
You've decided storage makes sense for your site. The challenge is ensuring it's sized to your actual load profile, safely specified, compliant with grid and fire regulations, and delivered without becoming a project you have to manage yourself.
Pretium Synergy takes an owner's-engineer approach: we assess your demand, design the right system, and deliver it under one fixed-price scope as your single accountable partner.
Use cases
Storage earns its keep in different ways depending on what's actually driving the decision. Most sites have one primary reason, occasionally two. We size the system around whichever of these actually applies to you.
01
Many commercial tariffs charge separately for your peak demand, not just total energy used—sometimes based on a single highest half-hour in the billing period. If this is a significant line on your bill, a battery sized to shave that peak can be the single biggest lever available.
Typical for: Warehouses, manufacturing, and any site with high, spiky demand.
02
Charging on off-peak or self-generated power and discharging when electricity is expensive. This is straightforward cost management that works off tariff structure alone, with or without solar.
Typical for: Any site on (or able to move to) a time-of-use tariff.
03
Backup through a grid outage for operations where downtime is a genuine cost, not an inconvenience. This changes the design—it needs backup-capable hardware and circuit selection, not just a storage-only system.
Typical for: Healthcare, cold chain/food storage, and data-dependent operations.
04
Where a site wants to add load (EV fleet charging, electrified heating, expansion) but the existing connection can't support it. A battery can smooth demand so the site operates within its current capacity, avoiding slow or costly DNO upgrades.
Typical for: Growing sites, fleet operators, and anyone electrifying other parts of the operation.
Some sites also generate revenue from grid services (demand flexibility, balancing markets). This is genuinely valuable where the system supports it, but usually a secondary benefit layered onto a system already justified by one of the four drivers above.
A warehouse chasing demand charges and a data centre needing backup are solving different problems, even though both are “battery storage.”
The challenge
Commercial battery storage fails on the details that a quick quote skips over:
Pretium Synergy manages these complexities so you don't have to become an energy trader, a fire safety engineer, and a project manager just to get storage installed properly.
How we work
We follow a disciplined four-stage process to ensure certainty at every step.
01
We analyse your half-hourly load profile, tariff structure, demand charges, and specific objectives (cost reduction, resilience, or both). We do not size a battery to fit a budget; we size it to fit your need.
02
We create a site-specific design covering chemistry, capacity, power rating, enclosure, and protection. We handle the structural and fire safety case, and the DNO application, as part of the core scope—not as surprises discovered mid-project.
03
Installation is executed under one fixed-price contract. We manage our own team and vetted subcontractors—you deal with one company throughout.
04
We handle commissioning, certification, monitoring setup, and provide an agreed support period beyond switch-on.
Business case
Once we know which driver matters most, sizing is about matching capacity and power rating to how you actually use and pay for electricity.
Our business case works from your actual half-hourly demand data, modelling realistic payback against the specific driver identified above.
Where more than one configuration is viable (e.g. capacity vs. power rating, standalone vs. paired with solar), we don't hand you a spec sheet and leave you to decide. We tell you which option we would choose, and why.
Grid connection
A commercial battery interacts with the grid on both charge and discharge. DNO approval must account for this bidirectional flow, and this is where projects most often stall.
We handle the entire process:
If reinforcement falls outside the agreed scope, it is identified transparently and agreed through a clear change process. You will never face a surprise invoice for grid works discovered post-installation.
We address the grid connection before the installation becomes a problem.
Safety
Battery energy storage carries risks genuinely different from solar or standard electrical work. These must be resolved at the design stage, not fixed after the fact. We specify to recognised UK fire safety guidance for battery storage.
Our safety protocol includes:
This is design discipline specific to storage, not a generic electrical checklist applied to a different technology.
Commercial terms
Our fixed price covers design, structural and fire safety case, DNO fees, equipment, installation, commissioning, certification, and an agreed initial support period.
Unforeseen site conditions (e.g. enclosure groundworks, structural strengthening, or DNO-mandated reinforcement) are identified early and agreed separately before work proceeds. This ensures our fixed price remains meaningful and accurate.
You define the outcome. We take responsibility for delivering it.
Ongoing relationship
The relationship doesn't end at commissioning. We stay involved to protect your investment:
Assess, design and deliver commercial solar under one fixed-price scope.
View Solar PV →Workplace and depot charging — go to the eMobility hub.
View EV ChargePoint →Commercial air source heat pumps assessed, designed, and delivered through one accountable fixed-price scope.
View Heat pumps →Zoned Air-to-Air (VRF/VRV) comfort cooling and heating — assessed, designed, and delivered through one accountable fixed-price scope.
View Air conditioning →Business case, technology pathway and fixed-price delivery.
View Energy Transition Planning →Tell us about your site, your load profile, and what you want storage to achieve. We'll assess the opportunity and deliver the agreed project as one accountable, fixed-price relationship.
Storage, safely assessed and properly delivered.