Commercial · Areas
Assessed for your plant or depot — not a corridor-wide guess
The Coventry–Birmingham manufacturing and logistics belt needs sober scoping for generation, heat, storage and fleet charging. Continuity, DNO capacity and downtime matter more than catalogue pricing — this is commercial plant and depot work, not Solihull homeowner copy.
Pretium delivers commercial solar PV, heat pumps and air conditioning, battery storage and EV charging (including CPO) with fixed-scope discipline after assessment.
Factories and distribution sites share the corridor but differ on roof form, yard space and downtime windows. We scope against the premises, not a generic Midlands estimate.
Commercial solar, storage and EV on this belt often need early DNO conversation. We flag programme risk when connection looks heavier than a catalogue quote implies.
Where you run several plants or depots across the belt, we plan a sequenced programme rather than one-off quotes that ignore portfolio priorities.
Grid, landlord consents and planning are site-specific — corridor notes are directional until we assess your premises.
Licence areas across the Coventry–Birmingham belt should be confirmed at assessment — much of this region sits with National Grid Electricity Distribution (former Western Power), but postcode bands vary. Commercial solar, storage and EV charging may need more involved connection processes than domestic G98; Pretium flags the likely route and programme risk early.
Plant and depot roofs and carports where assessed
Explore Commercial Solar PV →Commercial heat paths — survey then fixed scope
Explore Commercial ASHP →Offices, amenity and process comfort where relevant
Explore Air conditioning →Demand and resilience where sized properly
Explore Energy storage →Workplace, depot and destination charging
Explore CPO / fleet charging →Sequenced multi-site plan for operators on the belt
Explore Energy transition packages →
Current · Business will help you see what's realistic for this site — then you can browse commercial offers when you're ready.
Grid connection, landlord consents and planning constraints are site-specific. The notes above describe corridor-wide patterns only. We confirm the position for your premises as part of assessment before recommending a fixed scope.