Pretium Synergy
Log in
  1. Home
  2. ·Residential
  3. ·Areas
  4. ·Bath & Cotswolds

Residential · Areas

Solar, Heat Pumps & EV Charging in Bath & the Cotswolds

Checked against your actual property, not an area-wide guess

Bath and nearby Cotswolds towns — including places such as Cirencester, Tetbury and Stow where we cover — mix Georgian, stone and period stock with later suburban homes. Roof form, listing status and conservation setting often matter more here than in a typical commuter belt.

Pretium Synergy installs solar PV, battery storage, air source heat pumps and EV chargers — assessed against the property and planning status, not a generic West Country template. This guide is residential only; Bristol commercial work sits on a separate corridor.

What's different about installing here

  • Conservation and listed buildings are common — check the address

    Conservation areas and listed buildings are common in Bath and historic Cotswolds cores. What that means for solar or a heat pump depends on the exact address. General householder restrictions are not automatically the same as microgeneration (Part 14) rules — we check before recommending anything.

  • Article 4 is not the same as Part 14

    Article 4 directions that remove certain householder rights do not automatically decide solar or heat pump outcomes. Microgeneration permitted development still needs an address-specific read of the direction and the property.

  • National Landscape settings in parts of the Cotswolds

    Parts of the Cotswolds sit within National Landscape (AONB) settings. That can matter for some addresses more than others — we confirm at assessment rather than assuming a blanket rule.

  • Stock mix and parking decide EV fit

    Period stone homes and later semis or detached houses sit side by side. EV charging is realistic where off-street parking or a driveway exists; we do not assume every Bath terrace has that.

  • We confirm your specific status before you commit

    Address-level planning and connection checks are especially important in this cluster — part of the initial assessment, not an afterthought.

Grid connection in Bath & the Cotswolds

Licence areas for Bath versus Cotswolds towns should be confirmed at assessment — much of the South West sits with National Grid Electricity Distribution (former Western Power), but postcode bands vary. Solar and battery may proceed under G98 notification or need G99 — Pretium handles this and flags early if the longer route is likely.

What we install here

  • Solar PV & Battery Storage

    Viable where roof and planning allow — survey matters more in conservation settings

    Explore Solar PV & Battery Storage →
  • Air-to-Water heat pump

    Whole-home heating path where suitable — survey then quote

    Explore Air-to-Water heat pump →
  • Air-to-Air heat pump

    Extensions and zoned comfort without whole-system replacement

    Explore Air-to-Air heat pump →
  • EV charger

    Where off-street parking or a driveway exists

    Explore EV charger →

Tell us your postcode and what you're considering

Current will help you see what's realistic for this property — then you can browse residential packages when you're ready.

Browse residential packages →

Planning information above is a general guide based on area-wide patterns and may not reflect your specific address. Conservation area boundaries, Article 4 directions, listed building constraints, and permitted development rights for solar and heat pump installations specifically should always be confirmed against the relevant planning authority’s current planning records before work proceeds — we do this as standard as part of your assessment.

  • OZEV
  • ★Trustpilot|Rated Excellent
  • Stripe ClimateStripe Climate Contribution

© 2026 Pretium Synergy Ltd

HomeResidentialAreasAll packagesCommercialInstallation termseMobilityContactPrivacy