+44 330 133 4060
Pretium Logo
Commercialβ–Ύ
  • Air Source Heat Pump
  • Air Conditioning
  • EV ChargePoint
  • Solar PV
  • Energy Storage Systems
  • Energy Transition Packages
Residentialβ–Ύ
  • ASHP & Aircon
  • EV ChargePoint
  • Solar PV & Energy Storage
  • Energy Transition Packages
CPO
Off-Grid
+44 330 133 4060WhatsApp
FacebookInstagramLinkedIn
Pretium Logo
CPOOff-Grid

Powering Your Transition to Electric Mobility

Future Ready EV Charging Designed Around How Your Organisation Really Moves

Reliable. Scalable. Built for the EV Era.

The UK’s shift to electric transport is accelerating at record pace.
More than 2 million new cars were registered in 2025, 58% were BEVs or PHEVs, and 1.85 million fully electric vehicles are now on UK roads. Your staff, visitors, customers and fleet are increasingly driving EVs β€” and they expect dependable charging wherever they stop.

A well engineered EV charging estate keeps vehicles moving, removes range anxiety, enhances site experience and strengthens your organisation’s sustainability profile. Pretium Synergy delivers scalable, future ready EV charging infrastructure designed around realworld behaviour β€” not assumptions.

πŸ‘‰ Start Your EV Charging Project β€” Contact Us

Email Us
Commercial EV Charging

Why EV Charging Matters for British Businesses

Keep Vehicles Moving

Provide charging where people already park β€” keeping staff, visitors and fleets ready throughout the day.

Remove Range Anxiety

Reliable, predictable charging builds confidence and avoids unnecessary detours or downtime.

Support Net Zero & ESG Goals

A clear, visible step toward decarbonising operations and improving environmental performance.

Improve User Experience

Modern EV charging increases site value, convenience and your organisation’s reputation.

EV Charging vs Traditional Fuel Stations

EVs don’t refuel like petrol or diesel vehicles. Charging happens while parked, turning everyday parking areas into high-value energy points.

🏒 Workplace car parksπŸ› Retail parks & leisure centres🏨 Hotels & hospitality sitesπŸš› Fleet depots & logistics hubs🏘 Residential developments

The impact: Charging becomes a convenience β€” woven into daily life β€” not a dedicated journey to a fuel station.

Build the Right Charger Mix

Match Charging Speed to Real World Dwell Time

Long Dwell (4–8+ hours)Fast AC (7–22 kW)Ideal for: workplaces, depots, hotels, residentialEmployee plugs in at 9am β†’ leaves with a full or near full battery by 5pm.
Medium Dwell (1–3 hours)Mid Power AC or Low Power DC (22–50 kW)Ideal for: retail parks, gyms, leisure sitesShopper spends 90 minutes β†’ gains 25–40 miles of range.
Short Dwell (10–45 minutes)Rapid & Ultra Rapid DC (50–150+ kW)Ideal for: fleets, quickstop locations, service areasDelivery van tops up 20–80% during a loading break.

The Takeaway: A balanced charging mix maximises utilisation, improves user experience and delivers the strongest ROI.

Why Pretium Synergy

1

End to End Expertise

We manage the entire EV charging journey β€” from survey and system design to installation, activation and long term operation. One partner. Complete accountability.

2

Open Protocol, Future Ready Systems

Our OCPP compliant architecture prevents vendor lock in and ensures your charging estate remains flexible, scalable and future proof.

3

Designed Around Real World Behaviour

Every charging estate is engineered using real data β€” dwell times, user patterns, fleet movements and operational workflows β€” ensuring infrastructure that reflects how your organisation truly operates.

4

Scalable Infrastructure

Our designs include capacity planning, dynamic load balancing and clear upgrade paths, enabling your charging estate to expand seamlessly as EV adoption grows.

5

Smart Monitoring & Trusted Support

Pretium Synergy offers reliable, transparent and cost effective management of your EV charging infrastructure through the Pretium CPO Platform. End users receive dependable, easy to use charging, while site administrators gain full visibility, control and reporting. To learn more, explore our CPO Services page.

Our 6 Step Commercial EV Charging Process

1. Survey & Analysis

We analyse dwell times, user groups, vehicle patterns and electrical capacity to build a data-driven plan.

2. System Design

Charger types, placement, routing, signage, accessibility and future expansion β€” tailored to your site.

3. Approvals & Compliance

We manage DNO applications, Building Regulations, planning considerations and OZEV grant support.

4. Professional Installation

Accredited engineers deliver clean, safe installations with minimal disruption.

5. Commissioning & Platform Activation

Every charger is tested, safety verified and connected to the Pretium CPO Platform. We provide independent secure connectivity and deliver onsite training for your team.

6. Ongoing Care & Expansion

We provide monitoring, diagnostics, updates and maintenance β€” and help you scale intelligently as EV adoption grows.

Ready to Build Your Charging Infrastructure?EV Charging That Works Today β€” And Scales for Tomorrow

Email Us
β˜…Trustpilot|Rated Excellent
Carbon Removal LogoSee our commitment to carbon removal

Company

  • About us
  • Contact us

Join Us

  • Pretium Team
  • Pretium Installation Partner

Privacy

  • Use of Website
  • Cookies, Privacy & GDPR

Sales & Installation

  • Terms of Sale, Installation & Warranty
  • FAQ

CPO

  • Terms of Service
  • FAQ

Β© 2026 Pretium. All rights reserved.

+44 330 133 4060WhatsAppFacebookInstagramLinkedIn